Automotive Materials

View Paper
ESSAY DETAILS Words: 581
Pages: 2
(approximately 235 words/page)

Essay Database > Science & Technology > Engineering
Q2: From the flow chart and tables in part1 we simply understand that too many products entering to the system and require the same machines which there are not enough machines available and this is a practical. Q3: There are some wastes in the system. To improve the system we have to do some changes in that. 1: waiting: Considering the manufacturing of product A, B I found out there is a delay in the Jig …

showed first 75 words of 581 total
Sign up for EssayTask and enjoy a huge collection of student essays, term papers and research papers. Improve your grade with our unique database!
showed last 75 words of 581 total
…diagonal (product F, R, D, A, S AND processes Fitting, Jig bore, C/Grind, C/Lathe) one block and (product K, Q, T AND T/Lathe machine, Drill, H/Mill, P/Mill, Grind, Deburr, V/Mill) another block. There was some exceptional elements in products (R, D, A and S) to do T/Lathe and Drilling these items needs separate consideration and this can be being manufactured somewhere else or sub contracting or even redesigned.