Kissimmee River present and past
View Paper
ESSAY DETAILS
Words: 788
Pages: 3
(approximately 235 words/page)
Pages: 3
(approximately 235 words/page)
Essay Database > Literature > English
Kissimmee River System Past and Present
Thirty years ago, the Army Corps of Engineers in partnership with the State of Florida began construction of a massive flood control project on the Kissimmee River in south central Florida. The flood control solution was the channelization of the river, converting its 103 plus miles of shallow, meandering river channel and floodplain to a geometric, essentially straight as an arrow.
Historically, the Kissimmee River meandered approximately 103 miles within a
showed first 75 words of 788 total
Sign up for EssayTask and enjoy a huge collection of student essays, term papers and research papers. Improve your grade with our unique database!
showed first 75 words of 788 total
showed last 75 words of 788 total